When five suppliers quote the same anchor chain specification, the prices can still differ widely. The reason is simple: a specification describes the required result, but it does not fully control how the chain is made. Billet source, flash butt welding parameters, heat-treatment curve, surface preparation before galvanizing and testing frequency can all change the delivered article.
For a new supplier or a new origin, the first shipment should be inspected in full. For a long-term supplier, periodic re-checks are usually enough to confirm that the process has not drifted. This guide is a factory acceptance reference for buyers. It does not replace a classification society product certificate where one is required.
| Item | What to verify |
| Documentation | Mill certificate, heat-treatment records, tensile and impact reports; heat number and batch traceable |
| Visual and weld | No cracks, cold shuts, slag inclusions or incomplete penetration; studs sound; galvanizing intact |
| Dimensions | Diameter, inside length, inside width, pitch and fitting dimensions within contract tolerance |
| Marking | Type, grade, material, batch and heat number legible and correct after galvanizing |
| Mechanical properties | Minimum breaking load met; low-temperature impact passed for AM3 / BM3 where required |
| Packing | Links not crushed; fittings protected; labels complete; coating protected during loading |
Put the following points in the contract technical annex:
- Timing: pre-shipment witness, on site or by video, plus re-inspection after arrival.
- Sampling: at least 2% of each lot and not fewer than 10 links; lots below 10 links inspected in full; welds and markings checked 100% visually.
- Records: numbered photos, mill certificate, heat-treatment logs, test reports and a signed witness sheet.
- Frequency: full inspection for the first shipment from a new supplier or origin; periodic re-check for ongoing supply.
If a non-conformity is found, double the sample. If it persists, treat the whole lot as non-conforming.
![]()
1. Documentation must reconcile
Check the mill certificate, lot mechanical test report, heat-treatment records and galvanizing report. The heat number and lot number should cross-check with each other and with the markings on the links. Inconsistent records are often a stronger warning sign than missing records.
2. Start visual inspection at the weld
The weld zone is where fatigue cracks commonly begin. Reject cracks, cold shuts, slag inclusions or incomplete penetration. On stud-link chain, check the stud and its contact with the link. On studless chain, check the link body and the heat-affected zone on both sides of the weld. Coating blistering, flaking or exposed steel should also be rejected.
3. Check dimensions against tolerance
Verify bar diameter, inside length, inside width and pitch. Check Kenter shackle and end link fit so that assembly on site is possible without binding. Out-of-tolerance links should be segregated and must not be mixed into finished bundles.
4. Confirm marking is still readable
Markings should include the manufacturer's mark, chain type and grade, material grade, batch number and heat number. Blurred characters, incorrect grade stamps or markings placed on the load-bearing section are major non-conformities.
5. Treat breaking load as a limit, not a working load
Mechanical samples are taken per lot. The minimum breaking load must be met. For AM3 / BM3 with CM690 material, low-temperature impact data should also be reviewed where required.
A key point for buyers: breaking load is not working load. The allowable working load, or WLL, is obtained by dividing the breaking load by a safety factor set by the project designer, not by the supplier.
Bundles should be bound firmly without crushing the links. Kenter shackles and fittings should be packed separately, with threads protected. Each bundle should carry size, type, grade, material, heat number and quantity.
- Heat numbers do not reconcile: hold acceptance and require completion or written explanation.
- Weld cracks or cold shuts: reject the link and double the sample.
- Low impact energy: segregate the lot and review the heat-treatment process.
- Incorrect or blurred marking: re-inspect the lot and re-mark without obscuring the original stamp.
- Blistering or exposed steel: re-galvanize, then re-inspect.
- Out-of-tolerance dimensions: segregate and do not mix into bundles.
A works approval is granted to a factory and confirms that its quality system, equipment and process control can support repeated production. A product certificate is issued for a specific batch and confirms that the order was witnessed, tested and marked consistently with the certificate.
The two are not interchangeable. For a first shipment from a new factory, process records and measured data matter most because there is no supply history to compare against.
If one item in your inspection does not reconcile, send us the chain size, grade, material and the records you have. Our engineering team can help identify where the issue sits in the production process.
SMEOCEAN supplies stud-link chain AM2 / AM3 and studless chain BM2 / BM3 in CM490 / CM690, with matching mooring fittings. Our factories hold works approvals from 11 classification societies; product certificates are issued per order on request and are not held in stock.
Contact us to discuss your anchor chain inspection or quotation requirements.
Disclaimer: This article is general purchasing and factory self-inspection information. It is not a project suitability assessment, technical selection opinion or acceptance conclusion. Classification society names refer only to facility approvals held by our factories and do not mean that any batch is certified or endorsed by any society. Contractual terms, delivery standards and acceptance methods are governed by the signed contract and its technical annex.
How Anchor Chains are Manufactured ?
Stud Link vs. Studless Anchor Chain: Which to Choose?